2.13.2.3 EQUIPMENT USED

The equipment used for bunkering operations must be inspected at appropriate intervals and maintained as required under section 10 of the ISM Code. Gauges and other sounding and measuring instruments must be properly calibrated before being used to avoid any incorrect measurements or soundings which may cause an overflow with catastrophic consequences.