Table of contents
2.12.6.5 COMPLETION OF LOADING - LASHING SURVEY
Upon completion of loading, careful lashing based on a calculated lashing plan must be carried out. If a lashing plan is not provided from ashore prior to loading, the Master should ask the Company to instruct a competent expert experienced in the loading and lashing of heavy lift cargoes to prepare a lashing plan for a safe passage.
A lashing survey